Shooting Range

Demolition, Excavation & Construct formwork for the new foundation.

-

1 - 2. Existing conditions.
3 - 4. Demolition.
5. Excavation.
6. Construct formwork for the new foundation.
7. Placement of steel reinforcing rods to strengthen the concrete.
8. Placing 6mm polyethylene vapor barrier and 4 ga. wire reinforcing.
9. Removing forms.
10 - 11. Placing and screeding of 4000 psi. concrete.
12. Preparing Sonotubes for the footings.
13. Rough framing for the new office.
14. Installing new pressure treated columns to support the roof truss system.
15. Insulation and electrical for new office.
16. New trusses for roof system.
17. Plywood sheathing for roof system (should be after #20).
18. New shingles have been applied.